Handpicked experience · Hamburg
Hamburg, Germany
A waterfront walk through two opposite answers to the same problem: a warehouse district held up by oak piles that survive only because they stay wet, and a modern quarter built to let the water in.
A brick quarter carried entirely on submerged timber
The customs arrangement that produced the whole district
Loading gear, canal frontages and stacked openings still in place
The trade goods the warehouses were built around
A modern quarter that accepts water instead of excluding it
The concert building seen in its waterfront context
A walking tour of three parts of Hamburg's waterfront that were built a century apart and can be read against each other: the Speicherstadt warehouse district, the HafenCity quarter behind it, and the Elbe Philharmonic Hall standing where the two meet.
The Speicherstadt looks like solid ground with canals cut through it. It is the opposite. The whole quarter was built on soft marsh, and the brick blocks rest on thousands of oak piles driven down into the mud — a timber forest under the water table, holding up several kilometres of warehouse.
Those piles survive because they stay wet. Kept submerged, oak does not rot, which is why a nineteenth-century solution is still carrying twenty-first-century buildings.
This is not a picturesque old port that grew slowly. It was built quickly, from 1883, when the city agreed to join the German customs union and needed a fenced area where goods could be landed, stored, sorted and re-exported without crossing the border for tax purposes.
Building it required clearing the islands that stood here, and around twenty thousand people were moved out of their homes to make room. The district's beauty and that displacement are the same event, and a tour that leaves the second part out is telling half the story.
Each warehouse has a face on the canal and a face on the street, because goods arrived by barge and left by cart. There were no lifts. Loads went up on winches mounted at the gable, through doors stacked on every floor, which is why the façades have that regular grid of shuttered openings.
Inside, licensed warehousemen sorted and sampled the cargo — coffee, tea, spices and above all carpets, which are still stored here in quantity because the buildings breathe well and keep them dry.
HafenCity, built on the docks behind, does not rely on a dike wall. The buildings sit on raised plinths above flood level, while the lower roads and promenades are simply allowed to go under water when the tide comes up. Bridges and raised walkways keep the quarter usable while parts of it are submerged.
It is a very different answer to the same problem the warehouses solved with oak, and standing between the two makes the argument visible.
Flat walking on cobbles, quaysides and bridges, largely outdoors and often windy off the water. The route passes the concert building rather than entering the halls. Late afternoon is best for the brickwork, which turns from brown to red as the light drops, and the canal reflections are worth the wait for still water.
Open it to pick a date and work out the price.
What the fare covers, and what to budget for separately.
The practical detail, and the answers people actually ask for.
Thousands of oak piles driven into soft marsh, which hold up the brickwork and survive because they remain permanently wet.
Because it stays below the water table. Submerged oak is remarkably durable, which is why the original foundations still carry the buildings.
The city joined the German customs union and needed an enclosed area where goods could be stored and re-exported without formally entering the country.
Around twenty thousand were displaced from the islands cleared to build it, which is part of the district's history rather than a footnote to it.
Because there were no lifts. Goods were hoisted by winches at the gable and taken in through openings at each level.
Coffee, tea, spices and especially carpets, which are still kept here in quantity because the buildings hold their humidity well.
It does not keep water out. Buildings stand on raised plinths and the lower streets are allowed to submerge, with bridges keeping the area connected.
The walk passes the building and treats it as part of the waterfront's story; entering the auditoriums is arranged separately.