精选体验 · Paris
No engineer had built a lift that climbs a curved, sloping leg — and the water hydraulics installed for the answer are still running in the pillars.
Road, river and summit in a single booking
A covered vehicle that works whatever the weather does
A glazed boat with a terrace at the stern
Flexibility to take the river portion later the same evening
Someone travelling with you who handles the joins between segments
Six hours across Paris in three parts: a covered panoramic coach circuit, a one-hour glazed Seine cruise, and priority lift access to the summit of the Eiffel Tower, with a host throughout.
The tower posed a problem no engineer had solved: a lift that climbs a leg which is both sloping and curved. Ordinary lifts run straight up a shaft. These had to follow the bend of the ironwork, changing angle as they rose, while carrying hundreds of people.
France wanted a French firm to do it and no French firm could. The contract for two of the pillars went to Otis, the American company, over objections — the rules for the 1889 exhibition favoured domestic suppliers, and the organisers had to concede that the expertise did not exist at home.
What makes this more than a historical footnote is that the original solution is still running. The lifts in the east and west pillars work on water hydraulics installed at the end of the nineteenth century, and the great pistons and pulleys are visible to anyone who looks into the machine rooms at the base.
They have been maintained continuously rather than replaced. It is one of the oldest pieces of working passenger machinery anywhere, doing the same job it was built for, several million times a year.
The summit is not reached by the same car. The curved lifts run as far as the second floor and stop, because above that the tower narrows into a straight vertical shaft and a different kind of lift takes over.
So the ascent comes in two stages with a transfer between them, which is not a delay but a consequence of the shape of the building.
The cruise ticket is issued on the coach rather than bought at the quay, and can be used later the same evening if the timing suits you better.
The coach on this version is covered rather than open-topped, which trades the unobstructed view for shelter — worth knowing if the open deck was the appeal.
Priority access applies to the lift queue. The security screening at the base applies to every visitor regardless, and the summit itself closes in strong wind, decided on the day.
It is much colder at the top. Bring more than the forecast suggests, and your own earphones for the commentary.
展开即可选择日期并算出价格。
价格涵盖哪些内容,以及要另外预留哪些开支。
实用细节,以及大家真正会问的问题。
They climb a leg that is both sloping and curved, so the car changes angle as it rises.
Two pillars went to Otis, the American firm, because no French company could solve it.
Yes — the 1889 exhibition rules favoured domestic suppliers, and an exception had to be conceded.
Yes. The east and west pillars still run on water hydraulics from the end of the nineteenth century.
Several million, which is why the century-old machinery is inspected constantly rather than occasionally.
The curved cars stop at the second floor, where the tower becomes a straight vertical shaft.
On board the coach, and it can be used later the same evening if that suits better.
No, this version uses a covered coach, trading the open view for shelter.